NLS Lighting

Luminaire mechanical design

Mechanical design, prototype iteration, and testing for retrofit and outdoor lighting hardware.

Role
Mechanical Engineer
Dates
2022–2023
Luminaire assembly documented during my work at NLS Lighting.
Luminaire assembly documented during my work at NLS Lighting.

Design responsibilities

At NLS Lighting, I worked across mechanical design, fabrication, testing, and production release. My projects included retrofit hardware, mounting brackets and adapters, concealed fasteners, gasket interfaces, and installation procedures.

I used SolidWorks for parts and assemblies, prepared manufacturing drawings and bills of materials, and worked with colleagues in engineering and fabrication to review prototypes and revise the hardware.

Expanding retrofit clamp

The DCPT retrofit needed a way to secure an LED tower inside an existing casting that had no mounting holes. I designed an expanding clamp that could be inserted through the opening, positioned at the widest part of the casting, and tightened in place.

The LED tower then locates over the clamp’s screws and is secured with nuts. This made the attachment sequence part of the design: insert, expand, center, and fasten. The hardware and its installation instructions were developed together.

Two views of the DCPT expanding clamp
The expanding clamp I designed for the holeless casting.
Four installation steps showing the clamp entering the casting and supporting the LED tower
The four-step installation sequence: insert the clamp, expand and fasten it, position the LED tower, and secure it.

Lens-ring gasket compression

For the Savannah fixture, the lens assembly needed to compress its gasket as the retaining screws were tightened. I modified the lens ring with a circumferential chamfer. A set screw contacting that sloped surface pushes the ring downward, turning screw tightening into gasket compression.

We checked the physical contact and fit after assembly. The contact marks helped us trace the screw’s movement along the chamfer, while dimensional checks and inspection of the gasket showed how the parts seated. The lens compressed the gasket without an added weight on top.

I tested the revised assembly with Christopher Wang on November 10, 2022. The internal water-ingress report recorded a pass for both the lens interior and driver compartment.

Water testing the Savannah fixture after the lens-ring and gasket revision.
Water testing the Savannah fixture after the lens-ring and gasket revision.

Water-ingress and thermal testing

My testing work covered more than one fixture family. I performed the Radian gasket and water-ingress test with Vincent Vuong, and later tested complete DCPT-G118 and DCPT-G192 fixtures with Frank Mata and Christopher Wang. The February 2023 DCPT reports recorded passes for the lens interiors and driver compartments.

I also conducted thermal testing and worked on static finite-element analysis of luminaire hardware. I worked with Kevin Lu on a long, curved mounting arm under wind-force cases of 90 N and 180 N.

Powered luminaire beside laboratory instrumentation
A powered fixture on the laboratory test bench.

Production and retrofit hardware

My VSS space-filler bracket work balanced material use, stiffness, and assembly. The design log records reducing material while using bends and screw inserts to support the part. Other assignments included an adjustable three-bolt arm arrangement, glare shields, custom baseplates and tenons, and covers for arm transitions.

At another interface, the VUE-4 could attach directly, removing the need for a separate adapter. I also worked through fit and assembly checks on the Value Series, coordinating prototype drawings and revisions with engineering and fabrication colleagues.

For a Sedona customer-review fixture, the work included adapter fitting, driver programming, a bill of materials, and fabrication drawings with the team. I carried design changes into SAP BOMs, engineering-change records, and shop-floor documentation.

Illustrated VSS-S retrofit installation instructions
VSS-S retrofit instructions: replacing the chassis and driver while reusing the mounting arrangement.
Reviewing an assembled fixture with the NLS team.
Reviewing an assembled fixture with the NLS team.

This work involved close collaboration with Kevin Lu, Vadiraj, Dan, Pablo, Frank, and the co-testers named in the test reports. Design reviews and fabrication feedback shaped the final hardware.